Our Work

See the work.
Judge the finish.

These Southern Ohio driveways and lots show the difference careful preparation, sound repairs, quality sealcoating and straight lines can make.

Before & After

Drag the line.

An unfinished site is on the left and a sealed, freshly striped lot is on the right. Drag the line to compare the difference careful surface work makes.

After: finished sealcoated parking lot with fresh striping
Before: graded aggregate base ready for paving
Before After

Project Gallery

Featured work.

Commercial parking lot, deep black surface with fresh yellow striping The Finish
Commercial · Seal + Stripe

Black, Lined and Open for Business

A deep black surface and crisp lines make a lot look well cared for from the street. Careful sealcoating and striping deliver that finish.

Asphalt crew working a fresh black surface Field Work
Crew · Surface Work

The Work Behind the Black

Good asphalt work is timing and discipline — prep before product, the right material at the right temperature, and a crew that finishes what it starts.

Bare graded site showing the ground beneath pavement Below the Surface
Education · Base & Drainage

What's Under Your Asphalt

Every surface sits on ground like this. Reading base and drainage condition is the first step of every Hester site visit — it decides what your pavement actually needs.

Annotated aerial plan showing a phased parking lot program Site Plan
Commercial · Maintenance Plan

Phased Lot Work

We complete a working property in sections so the business can stay open while sealcoating and striping are finished.

Sealed versus unsealed asphalt comparison graphic Service Visual
Residential · Sealcoating

The Sealcoat Line

One pass of the squeegee shows the difference: deep black protection on one side and faded gray asphalt on the other.

Top-down parking lot layout with ADA stall and striping plan Layout Plan
Commercial · Line Striping

ADA Ready Restripe

A restripe is the cheapest moment to fix flow, recover stalls and get ADA layout correct. This is what the plan looks like.

The Work

From inspection to finished lot.

  1. Bare ground showing what sits beneath every pavement
    Phase 1 · Assess

    Read the Surface

    Every plan starts with what's really there: base condition, drainage paths, crack patterns, traffic wear. The site visit decides the scope — not a sales script.

  2. Asphalt crew at work on a black surface
    Phase 2 · Restore

    Repair, Fill, Seal

    Failures get cut out and patched, cracks get hot rubberized filler, and the whole surface gets commercial grade sealer — in one sequenced visit wherever possible.

  3. Finished lot with fresh yellow striping
    Phase 3 · Finish

    Stripe & Open

    We chalk the layout, stripe stalls and lanes by machine and check the signage. The lot goes back to work on the schedule we promised.

Free Estimates

Your property could be next in the gallery.

Request an estimate and we'll bring the same preparation, craftsmanship and care to your property.

Call Request Estimate